Posted by Josephine Trawick on Friday, June 24, 2011
All proposed work has been approved. This includes patching and
resurfacing of Stillmeadows Drive, repair of curbs and sidewalks, and
the installation of 12 handicap ramps.
The schedule of work has changed to perform ALL concrete work first.
The schedule is as follows:
Jun 25, 27, and 28: Concrete work (curbs, sidewalks, and handicap
ramps) . Areas marked in orange are slated for repair and/or
installation. Please note that Jun 25 is a Saturday. County will
install "NO PARKING" signs in advance of the repairs.
Week of July 05, 2011: Patching and Resurfacing